Severity: Notice
Message: Only variable references should be returned by reference
Filename: core/Common.php
Line Number: 239
Severity: 8192
Message: Non-static method Idioma_model::get_from_code() should not be called statically, assuming $this from incompatible context
Filename: models/proyecto_model.php
Line Number: 8
Excellence in Performance.
Building Safely on Sound Bases.
Preserving commitment to our Customers past the printed contracts.
Reliable Safe and timely construction practices.
West Palm Beach, Florida
$ 1,433,210
2012
City of West Palm Beach Engineering Services Division 401 Clematis St., 4th Floor West Palm Beach, FL 33401
Tracy Ward Senior Stormwater Engineer (561) 494-1120
Located in western West Palm Beach the Ironhorse Community and Country Club is adjacent to the Grassy Water nature preserve that is the primary source of drinking water for the City of WPB. This project was important for providing storm water drainage for Ironhorse as well as preserving water quality for the rest of the City.
Installation of two storm water pump stations. Major equipment at each pump station included two 7,200 gpm axial flow pumps, a 150 kW diesel generator and instrumentation and radio telemetry equipment for control and monitoring by the City. A total of 280 ft of DIP and PVC pipe as well as 440 ft of 54” corrugated metal pipe were installed. Extensive site restoration and improvement with the addition of 320 trees and shrubs, and restoration of 2,800 SY of golf course Tifway sod.